  • Westside Business Park
  • IEM Dyno
  • OA LogistiPort Phase III
  • OA LogistiPort Phase IV

Westside Business Park

Westside Business Park, location of the Marchese Construction office, has some concrete catch basins that have been damaged throughout the years. The concrete catch basins funnel access storm water from the auxiliary roads in the business park to the storm water drainage underground.

We are working with the owners of the business park to replace the damaged concrete catch basins. Since each existing concrete catch basins have different shapes and sizes, wooden forms were used to create the curved surfaces for the catch basin replacements. There will be eight concrete catch basins replaced around the business park.

[ For photos of a sample of all of our current and past projects, please visit our gallery page. ]

.

IEM Dyno

In Pooler, GA, IEM is an industrial company that rebuilds electric motors for large industrial equipment. After rebuilding each electric motor, IEM needs to test the electric motor to make sure that the motor’s horsepower output is up to industrial standards.

We worked with IEM to build a 6’x8’ steel Dyno-plate that is recessed into a concrete slab. The concrete slab is 2' 6" thick to absorb the vibrations from the Dyno-plate. The Dyno-plate anchors the electric motor down for testing by use of straps with “T’s” at the end. The “T’s” are twisted into the grooves to lock the electric motor in place. A Dyno-tester is lowered into the concrete slot in front of the plate to read the output from each motor.

[ For photos of a sample of all of our current and past projects, please visit our gallery page. ]

.

OA LogistiPort Phase III

JLA Home is expanding within their existing tilt-up concrete panel building. Phase III is a 2600 sq. ft. office space expansion. This expansion will have a new break room, cubical office area, office rooms, and new individual bathrooms.

In addition, there will be a warehouse office and two large bathrooms built in the middle of the building. This new addition will be built on the front wall for a check-in/out station for the distribution of JLA Home products.

[ For photos of a sample of all of our current and past projects, please visit our gallery page. ]

.

OA LogistiPort Phase IV

We are installing new edge of dock and pit levelers in the existing truck bays to help with the growing distribution of their products. Along the North and South Elevations, there are 23 new pit levelers and 72 edge of docks. There will be 400 cubic yards of concrete used to create the edge of docks and embedded around the new pit levelers.

[ For photos of a sample of all of our current and past projects, please visit our gallery page. ]

.

 

Joe Marchese Commercial Construction • 45 Columbia Drive, Suite #100-A, Pooler, GA 31322
912-330-8575 • info@joemarcheseconstruction.com

 
Site Credits